CHARGER DEVELOPMENT

EV charging standards implemented and verified on real equipment

IEC 61851, ISO 15118-2/-20 and OCPP must operate on real chargers, boards and servers. ELIOLABS verifies charger communication through real equipment, vehicle-side logs, CSMS events and SimCert screens.

EV charging diagnostic bench
IEC 61851Control pilot and charger states
ISO 15118V2G/PnC communication
OCPPCSMS integration
HAROKCharger host app
ReportsField evidence
AC/DC

Charger control

Charger status, relay, metering and user flow are connected through the host app.

OCPP

Server operation

OCPP 1.6, 2.0.1 and 2.1 flows can be checked through ARCANIA CSMS.

DIAGNOSIS

BARK tester

CP/PWM, PLC, SLAC, SDP, TLS and PnC conditions are visible on the diagnostic device.

DELIVERY

Development documents

Interface, test procedure and handover materials are prepared for partner engineers.

Validation path proven on boards and server logs

The charging communication stack is verified through charger boards, real-device videos, CSMS logs and diagnostic screens.

01

Charger board

Power and control signals are prepared.

02

HAROK App

Charger host logic runs the local process.

03

TROY Modem

PLC/V2G communication is handled.

04

ARCANIA CSMS

OCPP and transaction status are verified.

05

Evidence

Screens and reports document the result.

Build chargers with implementation evidence

ELIOLABS supports charger development, OCPP/ISO 15118 integration, diagnostic screens and field validation deliverables.